As the entire state of West Bengal stands united in this fight to rebuild Bengal, EAST BENGAL the REAL POWER (EBRP) decided to join the campaign too in our own way. Keeping in mind the tradition of EBRP to stand tall and deliver it’s best in various social responsibilities we have devoted ourselves in the quest to rebuild Bengal with our very own campaign named as “Ctrl + Z Bengal”.
EBRP initiated this campaign on May 24 by collecting funds from East Bengal supporters around the globe. The fund collection process closed on June 10 Midnight.
On June 12, EBRP conducted their Phase #2. As part of this EBRP went to Shibnagar, Patharpratima, where they carried out the following activities
- Distribution of almost 2500 Kgs of relief material which includes, food supplies, tripol, medicines etc.
- Our target of distributing relief materials to 100 families was achieved
- Handed over Bleaching powder and lime to the local governing body to help the reform of the local water bodies.
- Day long medical camp with distribution of medicines to almost 200 people.
- Distribution of education material to almost 200 students in local school.
EBRP also like to thank all the villagers of Shibnagar, we will never forget the love they showered on us. Last but not the least EBRP would like to acknowledge all our patrons who believed in us and make this mission a reality.
EBRP is currently studying the feasibility of a third phase. We will keep everybody posted on the same.